The projects and the News do not stop here!

Etanolduto DN 12″ 4Pipe-Hidropig has participated in the pre-operation stage of Logum Logístics pipeline, 12″ in diameter and 32 km long, connecting the Guarulhos Terminal of Logum (TTGRU), to Point A of São Caetano do Sul (PASCS), where ethanol is delivered to 3 large customers. The inertization steps of the pipeline were performed, through the […]